Residential project examples |
|
|
|
|
|
|
|
Dorchester Prison |
|
|
|
|
|
Callidus prepared and access strategy, Transport Assessment
and Travel Plan on behalf of City and Country for the conversion of Dorchester Prison
to residential use. The proposals were granted planning consent on 2017 and
work to develop the site will take place over a number of years. |
|
|
|
|
|
|
|
|
|
|
|
Land East of Coldharbour Lane |
|
|
|
|
|
Working on behalf of Taylor Wimpey, Callidus prepared
a Transport Assessment, Travel Plan, Flood and Drainage advice for this major urban
extension site. This consisted of 550 residential units and integrated with
the West of England Bus Rapid Transit scheme. Planning approval was granted
and the site is being developed out. |
|
|
|
|
|
|
|
|
|
|
|
Chalgrove, South Oxfordshire |
|
|
|
|
|
Callidus prepared a Transport Assessment and Travel Plan
in support of 200 units at this site in Oxfordshire. A successful consultation
exercise resulted in this site being the preferred site through the Neighbourhood
Plan. It was subsequently given outline planning consent. Callidus is
retained to prepare a Stopping Up order to facilitate the development. |
|
|
|
|
|
|
|
|
|
Shepton Mallet prison |
|
|
|
|
|
After working on this siye for the MoJ, Callidus were retained by the site's purchasers,
City and Country. Callidus advised on transport, access and travel planning.
The site was subject to an appeal in 2017 and the outcome is awaited. |
|
|
|
|
|
|
|
|
|
Christ College, Cheltenham |
|
|
|
|
|
Callidus prepared a Transport Statement, Travel Plan,
Flood and Drainage advice for 50 residential units on the site of a former secondary
school on behalf of the Clifton Diocese. Callidus were also retained by the
housebuilder that subsequently built the site. |
|
|
|
|
|
|
|
|
|
|
|
Easterton, Wiltshire |
|
|
|
|
|
Transport Assessment, Waste Minimisation Strategy, Flood and
Drainage advice for 50 residential units on the site of an old jam factory.
Access to the site was constrained along a narrow rural lane. Callidus
developed an access solution and off site highway works to the satisfaction of the
Highway Authority. |
|
|
|
|
|
|
|
|
|
|
|
Residential Development (43 Units) , Cheshire |
|
|
|
|
|
Callidus provided an assessment of transport impact and highway access off an arterial
road to enable
the successful release of this residential site. |
|
|
|
|
|
|
|
|
|
|
|
Homelands Farm, Bishops Cleeve (900 units) |
|
|
|
|
|
Callidus has provided transport, highways,
flood risk and drainage advice for this major residential site in Gloucestershire.
Our input to the project covered the pre-planning preparatory work, public inquiry
representation and post consent design work. Callidus were retained by the
house builder to undertake the detailed design work (shown under construction opposite). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|